Thursday, July 9, 2009

My First House (3 rooms HDB flat)

Today is the big day of my house.. renovation start work! ~ "kui gang" lor... But too bad I cannot be there due to my "ba zi xiang cong" - (Fengshui)??... Orrgg~! Mum insist not to let me go down to have a look...

The date & time was selected by one of the temple, hmmm.... not sure the name, because it was totally handed by mum. The best timing to start my renovation work should be 10:00AM, but I informed Mr. Jensen (my designer) 10:30AM instead. All my fault, end up he have to rushed down alone for the start work "Event" - taking down a piece of glass. Sorry Mr. Jensen for the wrong info given. My mum was wondering why no hacking... haha!

Well done~! He already found out the solution for my new "JUMBO" Kitchen package to fit in my "peanut" size 3 room flat, haha...

2D drawing from him~~! Yet to get 3D drawing, will be upload once i got it...

Layout of my kitchen...

Amazing work done by them... Washing machine is hide under the oven and cover by a dummy door, and it actually accessing by the back of the cabinet (entrance of the toilet). Gas pipe exposed, hopefully they can try to cover it up...

Another headache here... How do I hang my clothes next time? Got to find some solution... Recommendation anyone?

1 comment:

  1. This is so interesting blog at this page. This is so nice design improvement this house. I like this so good services post at this site of positive feedback from people. I like this architect.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...